Calculate shape volume
Rectangular pours use length × width × thickness. Round pours use π × radius² × depth.
Volume before the pour
Calculate slabs, footings, walls, columns, and circular pads in US or metric units—with transparent bag yields and allowance.
Project calculator
Estimate concrete volume, ready-mix yards, bags, and cost.
Methodology
Rectangular pours use length × width × thickness. Round pours use π × radius² × depth.
Identical footings, pads, or columns are combined before the planning allowance is applied.
The default 10% follows Sakrete’s planning guidance for uneven bases, spillage, and jobsite variation.
Recommended volume is divided by the selected product yield and rounded up to the next whole bag.
Worked example
20 ft³exact volume
+2 ft³10% allowance
=37 bags80 lb mix at 0.60 ft³
Without the allowance, the same slab requires 34 whole 80 lb bags. Always confirm product yield and project requirements before ordering.
Frequently asked questions
Uneven bases, form variation, spillage, and inaccessible remnants can increase the volume needed.
No. It estimates material volume only; project design and structural requirements need appropriate professional guidance.
Yes. The ticket shows cubic yards and metres alongside whole-bag estimates.
This calculator estimates material volume only. It does not determine slab thickness, reinforcement, mix strength, soil preparation, or structural suitability.
Last reviewed: July 16, 2026