Measure the run
Record the total fence length in one unit, then subtract the width of any gates you plan to install.
Fence planning tool
Turn a fence run into whole posts, rails, pickets, concrete bags, and fasteners for a wood privacy or picket fence.
Fence planning tool
Estimate fence posts, rails, pickets, concrete, and fasteners.
Methodology
Record the total fence length in one unit, then subtract the width of any gates you plan to install.
Split the run into bays between posts using your post spacing, rounding up to whole sections.
Posts close every section plus each gate side. Rails run per section, and pickets fill the run at the pitch of their width plus gap.
Concrete bags scale with the post count, and fasteners scale with the pickets. Both are planning estimates.
Worked example
100 ftfence run
÷8 ftpost spacing
=13 sections14 posts
From 13 sections, this run needs 14 posts, 39 rails, 240 pickets, and 28 bags of concrete before a 10% allowance.
Frequently asked questions
Divide the run by your post spacing and round up to get the sections, then add one to close the far end, plus two posts per gate.
Divide the run by the picket pitch (width plus gap), then add a waste allowance. A 100 ft privacy fence with 1×6 pickets takes about 240 pickets at 10% waste.
About two 50–60 lb bags per post for a typical 6 ft fence. Heavier gate or corner posts often need three. This calculator uses an editable bags-per-post value.
Yes. Metric mode uses metres for the run, spacing, and gates, and centimetres for picket width and gap.
Enter a price per post and per picket. The calculator multiplies each by its count and sums them. Without prices, no cost is shown.
This tool estimates fence materials for planning. It does not select post depth, footing design, or gate hardware, and it does not replace local building, zoning, or HOA requirements or retrieve live prices.
Post spacing, rails per section, concrete bags per post, and fastener counts are planning estimates for a typical wood privacy fence. Confirm local frost depth, wind, and code requirements before digging.